Metz assisted the installation effort by providing training videos prior to shutdown, but when installation commenced three Metz personnel were present to ensure training of the local Saudi applicators. One Metz Supervisor remained on site for the bulk of the installation works
Project: EDC Cell and Trench Protective Coating
Date: June 2009 Location: SADAF Saudi Petrochemical Company (SABIC) Installer: AK Group Product: Metz 33EN-TG, Metz 33EN-VG, Metz Viton Caulk – Approx 7,000m2. |